English

BJTDS successfully implemented the rescue of the malfunction EMU

2018-03-26 14:49
At 23:17 on May 24, 2017, the Xi'an Railway Administration CRH380B-3764+3710 rejoined the EMU Operation to the Yang Lingnan interval of the Bao Lan line. Because of the failure of the EMU, it could not continue to move forward. At the 2:44 of the next day, the EMU of the railway department was successfully transported to the Xi'an EMU.

Page View:125080725

京公网安备 110402430053 号

Copyright © 2016 Beijing Railway Institute Of Mechanical And Electrical Engineering Co Ltd